-
Q2 2023 turnover at €100 million supported by strong growth of the capacity in operation
ソース: Nasdaq GlobeNewswire / 26 7 2023 11:30:00 America/Chicago
Q2 2023 turnover at €100 million
supported by strong growth of the capacity in operationStable second quarter amid strong growth in energy sales and internal services
- Energy sales : +41%. Sharp increase of solar and wind production (+40% at 0.9 TWh) thanks to the new plants commissioned in 2022 and 2023
- Services : +85% (before eliminations). Internal services quadrupled, with a very high level of own-account projects (961 MW), but a -50% fall in services to third-party customers, which was a one-off event, as few significant milestones were reached over the period
Capacity in operation and construction
- 2.7 GW in operation and under construction (+24% vs H1 2022): 1.7 GW in operation and almost 1 GW under construction
Confirmation of 2023 objectives
- 2023 target of 2.6 GW in operation and under construction achieved in 2022, one year in advance
- Confirmation of normalised EBITDA1 target of €275-300 million
2027 ambitions reaffirmed
- Owned capacity in operation and under construction : over 5 GW
- Capacity operated on behalf of third parties : over 8 GW
- Normalised EBITDA2 : around €475 million
- CO2-equivalent avoided : over 4 million tonnes
Voltalia (Euronext Paris, ISIN code : FR0011995588), an international player in renewable energies, publishes its second quarter and first half 2023 turnovers.
« Power production increased sharply over both the quarter (+40%) and the first half of the year (+41%). Ongoing projects, with a capacity of almost 1 GW, most of which will be completed before the end of the year, will enable this trend to continue. In Services, growth is being driven by internal services, with teams often working on projects for their own account », commented Sébastien Clerc, Voltalia’s CEO.
Turnover for the second quarter and first half of 2023
In € millions3 Q2 2023 Q2 2022 Change
At current exchange ratesChange
At constant exchange rates 4H1 2023 H1 2022 Change
At current exchange ratesChange
At constant exchange rates 2Energy Sales 75.2 53.1 +41% +44% 138.0 96.2 +44% +43% Services 156.2 84.5 +85% +88% 258.1 149.2 +73% +74% Eliminations -131.3 -34.8 x4 x4 -197.2 -47.2 x4 x4 Turnover 100.0 102.8 -3% stable 198.9 198.1 stable stable BUSINESS REVIEW
Turnover for the first half of 2023 came to €198.9 million, stable compared with the first half of 2022. It benefits from growth in Energy Sales (+44%). Services (+73%) are focused on internal activity (eliminated on consolidation), which increased multiplied by x4, to the detriment of external activity, which suffered a temporary decline (-40%). In this context, Energy Sales represented 69% of sales for the first six months of 2023, compared with 49% a year earlier.
Q2 2023 turnover came to €100.0 million, down -3% compared with Q2 2022 (stable at constant exchange rates). Energy Sales (+41%) contributed 75% to the quarter's turnover, compared with 52% a year earlier.
ENERGY SALES
Operational indicators
Q2 2023 Q2 2022 Variation H1 2023 H1 2022 Variation Production (en GWh) 882 630 +40% 1,842 1,308 +41% Installed capacity (in MW) 1,699 1,226 +39% Installed and under construction capacity (in MW) 2,661 2,143 +24% Wind load factor in Brazil 31% 27% +4pts 36% 30% +6pts Solar load factor in Brazil 20% 20% Wind load factor in France 21% 17% +4pts 27% 22% +5pts Solar load factor in France 22% 24% -2pts 17% 19% -2pts Solar load factor in Egypt 27% 28% -1pt 25% 25% stable Solar load factor in Jordania 31% 32% -1pt 26% 27% -1pt Turnover for the first half of 2023 from Energy Sales amounted to 138.0 million euros, up +44% at current exchange rates compared with the first half of 2022 (+43% at constant exchange rates). The average EUR/BRL rate was 5.48 in the first half of 2023, compared with 5.55 in the first half of 2022.
In the first half of 2023, production reached 1.8 TWh, compared with 1.3 TWh in the first half of 2022, up +41%, reflecting the improvement in wind resources in Brazil and France (+4 points increase in the wind load factor in both countries) and, mainly, the increase in installed capacity in operation to 1,699 MW (+39%) at the end of June 2023. Energy sales benefited notably from Helexia's growth over the half-year.
Q2 2023 turnover from Energy Sales reached €75.2 million, up +41% (+44% at constant exchange rates) compared with Q2 2022. Quarterly production was 0.9 TWh, up 40% from 0.6 TWh in 2022.
By country :
- In Brazil, production is up by +40% due to better wind conditions than a year earlier and the full production of SSM1 and 2 (320 MW), the company's largest solar power plant, commissioned in 2022;
- In France, production is up by +38% due to better wind conditions and production from plants commissioned in 2022 and 2023 (Helexia, Sable blanc, Sud Vannier) ;
- In other countries, Voltalia's production grew overall, multiplied by x8 in the United Kingdom with the new South Farm solar power plant, multiplied by x2 in Portugal with the start of production at the Garrido complex, and by +68% in Spain, marked by the strong growth in Helexia's production over the period. In Egypt and Jordania, production was down -4% year-on-year, due to a load factor that was slightly lower.
SERVICES
Turnover for the first half of 2023 from Services (internal and external) totalled €258.1 million, up +73% (+74% at constant exchange rates) compared with the first half of 2022. The Development, Construction and Equipment Procurement segment grew by +79% to €239.6 million, and the Operation & Maintenance segment by +23% to €18.5 million. Activity was temporarily concentrated on the internal services, with internal turnover (eliminated on consolidation) increasing multiplied by x4 to 197.2 million euros, and turnover with third-party customers falling by -40% to 60.9 million euros.
Q2 2023 turnover from Services (internal and external) totalled €156.2 million, up +85% (+88% at constant exchange rates) compared with Q2 2022. Activity was temporarily focused on the internal market, with internal turnover (eliminated on consolidation) multiplied by x4, and turnover with third-party customers falling by -50% (-47 % at constant exchange rates). Analysis by segment shows strong growth in the Development, Construction and Equipment Procurement segment :
- The Development, Construction and Equipment Procurement segment posted turnover of €146.6 million, up +91%, thanks to a fourfold increase in internal activity, reflecting the record capacity under construction for its own account, which stands at 961 MW at the end of June 2023. External turnover for this segment on behalf of third-party customers fell by -58% to €19.4 million. Although more than 550 MW are currently under construction for third-party customers, few milestones have yet been reached during the period, with Voltalia recognising construction turnover based on the progress of projects.
- The Operation & Maintenance segment recorded turnover of €9.6 million, up by +17% (+19% at constant exchange rates), driven in particular by third-party customers.
Turnover eliminations for H1 2023 and Q2 2023 came to respectively €197.2 million (x4 at current and constant exchange rates) and €131.3 million (x4 at current and constant exchange rates), reflecting the sharp increase in internal services for power plants under construction, the vast majority of which are due to be commissioned before the end of 2023, and during the operating period.
RECENT DEVELOPMENTS (SELECTED)
Update on Canudos project (99.4 MW): confirmation of the validity of the construction permits by Brazilian federal court
Voltalia announces today that the Brazilian federal court of appeals overturned the preliminary decision that had suspended the Canudos project’s permits last april5 . Voltalia has the authorization to finalize the works, carry out the commissioning and start the operation of the wind farms. In parallel with the resumption of operations, Voltalia will present a complementary environmental study and arrange a public hearing with local communities within 6 months. The Public Prosecutor will have the possibility to make an appeal to this second instance decision within a limited time period (30 business day after being intimated of this decision).
First megawatt-hours for the SSM3-6 solar power plant in Brazil6
SSM3-6 is part of the Serra Branca cluster, the largest wind and solar cluster in the world, developed entirely by Voltalia. The cluster generates some of the most competitive energy in the country, with exceptional levels of wind and sunshine as complementary energy sources. Out of a total of 260 MW, 17 MW came on stream in June and a further 83 MW since the beginning of July. The rest will gradually be brought on stream over the coming months. The plant is backed by a 14-year electricity sales contract with Copel, a Brazilian utility and long-standing partner of Voltalia.
In French Guiana, commissioning of a combined solar and storage power plant7
Voltalia has commissioned its Sable Blanc power plant, combining photovoltaic generation, with a capacity of 5 MW, and battery storage, with a capacity of 10.6 MWh. Developed entirely by Voltalia, the mixed power plant will benefit from a guaranteed sales tariff for 20 years. The lithium-ion batteries will enable the electricity produced during the day to be injected after night fall, while improving the stability of electricity production in a region with high demand.
SNCF Energie signs a new wind energy supply contract with Voltalia8
The contract covers production at a wind farm in the Nouvelle-Aquitaine region of France. The contract is for a period of 25 years. The wind farm, called Rives Charentaises, has a total installed capacity of 37.4 MW, and will produce around 78 GWh a year, or 1.4% of SNCF Voyageurs' traction electricity consumption. The plant is scheduled to be commissioned in the first half of 2024.
Helexia wins a new 90 MW contract in Brazil9
The 20-year agreement between Helexia and Comerc Energia, a leading provider of energy management solutions in Brazil, covers the supply of up to 90 MW of photovoltaic solar power spread across a series of distributed generation projects. They will be built progressively in the Brazilian states of Mato Grosso do Sul, Ceará and Pernambuco. Construction work on the first projects will begin in the coming months, with commissioning scheduled for the first quarter of 2024.
Voltalia selected to build a 108 MW solar farm in Ireland10
ESB, a semi-state-owned utility company, and Bord na Móna, a semi-state-owned climate solutions company, have awarded Voltalia a contract to build their Timahoe North solar farm and maintain it for at least two years. The plant is expected to be fully operational by the end of 2024.
2023 OBJECTIVES CONFIRMED
Voltalia recalls that its target of 2.6 GW of capacity in operation and under construction, which the Company had planned to reach by the end of 2023, was reached by the end of 202211, one year ahead of schedule.
Voltalia reiterates its normalised EBITDA12 target for 2023, which is expected to be in the range of €275 to €300 million.
2027 AMBITIONS REAFFIRMED
Last October, Voltalia defined a new growth plan for 2027, including the following ambitions:
- Owned operating and construction capacity: over 5 GW;
- Capacity operated on behalf of third parties: over 8 GW;
- Normalised EBITDA13: around €475 million;
- CO2-equivalent avoided: over 4 million tonnes.
Forward-Looking Statements
This press release contains forward-looking statements about Voltalia and its subsidiaries. These statements include financial projections and estimates and their underlying assumptions, statements regarding plans, objectives, intentions and expectations with respect to future financial results, events, operations, services, product development and potential, or future performance. Forward-looking statements are generally identified by the words "expects," "anticipates," "believes," "intends," "estimates," "forecasts," "projects," "seeks," "strives," "aims," "hopes," "plans," "may," "goal," "objective," "projection," "outlook," and other similar expressions. Although Voltalia's management believes that these forward-looking statements are reasonable, investors and shareholders of the Group are cautioned that forward-looking statements are subject to numerous risks and uncertainties, many of which are difficult to predict and generally beyond Voltalia's control, that could cause actual results and events to differ materially from those expressed in, or implied or projected by, the forward-looking information and statements. These risks and uncertainties include those discussed or identified in the public filings made by Voltalia with the Autorité des marchés financiers, including those listed in Chapter 2 "Risk Factors and Risk Management" of Voltalia's 2022 Universal Registration Document filed with the Autorité des marchés financiers on April 14, 2023 under number D.23-0267 and in Chapter 5 "Principal Risks and Trends" of the 2022 interim financial report. These forward-looking statements are made only as of the date of this press release and Voltalia undertakes no obligation to update any forward-looking information or statements included in this press release to reflect any change in expectations or events, conditions or circumstances on which any such forward-looking statement is based. Any information regarding past performance contained in this press release should not be construed as a guarantee of future performance. Nothing in this press release should be construed as an investment recommendation or legal, tax, investment or accounting advice.Installed capacity as of June 30, 2023
In MW Wind Solar Biomass Hydro Hybrid14 June 30, 2023 June 30, 2022 Belgium 16.5 16.5 15.0 Brazil 732.3 367.5 12.0 1,111.8 821.0 Egypt 32.0 32.0 32.0 France 88.9 151.3 4.5 244.7 174.6 French Guiana 32.015 6.8 5.4 44.2 29.3 Greece 16.7 16.7 16.7 Italy 15.3 15.3 13.7 Jordania 57.0 57.0 57.0 Portugal 47.6 47.6 19.7 Spain 19.9 19.9 7.8 Hongrie 4.3 4.3 - United Kingdom 89.316 89.3 39.3 Total 821.2 849.4 6.8 9.9 12.0 1,699.3 1,226.1 Capacity under construction as of June 30, 2023
Name of the project Capacity Technology Country Canudos 1 99.4 Wind Brazil Rives Charentaises 37.4 Wind France Cafesoca 7.5 Hydro Brazil Bolebedu 148.0 Solar South Africa Karavasta 140.0 Solar Albania SSM 3-6 243.0 Solar Brazil Logelbach 12.1 Solar France Montclar 3.7 Solar France Garrido 25.0 Solar Portugal Clifton 45.0 Solar United Kingdom Higher Stockbridge 45.0 Solar United Kingdom Sinnamary 11.0 Biomasse /storage French Guiana Lercara Friddi 3.4 Solar Italia Helexia 0.6 Solar Belgique Helexia 96.8 Solar Brazil Helexia 0.9 Solar Spain Helexia 15.8 Solar France Helexia 19.4 Solar Hungaria Helexia 2.0 Solar Italia Helexia 5.4 Solar Portugal Total (in MW) 961.4 Power production as of June 30, 2023
In GWh Wind Solar Biomass Hydro Hybrid17 H1 2023 H1 2022 Brazil 1,120.2 290.7 21.4 1,432.4 1,000.9 Egypt 38.3 38.3 39.0 Jordania 63.6 63.6 65.6 France 90.9 91.0 2.3 184.2 134.4 French Guiana 4.7 18.1 - 22.8 21.6 Greece 13.9 13.9 9.0 United Kingdom 32.9 32.9 4.7 Portugal 26.4 26.4 13.1 Italia 12.2 12.2 7.7 Hungaria 0.9 0.9 - Belgium 6.2 6.2 7.4 Spain 8.4 8.4 5.2 Total 1,211.1 589.2 18.1 2.3 21.4 1,842.2 1,308.5 Next on the agenda : H1 2023 results, on September 27, 2023 (before market opening)
About Voltalia (www.voltalia.com) Voltalia is an international player in the renewable energy sector. The Group produces and sells electricity from its wind, solar, hydraulic, biomass and storage facilities. It has 2.7 GW of capacity in operation and under construction and a portfolio of projects under development with a total capacity of 14.2 GW.
Voltalia is also a service provider and supports its renewable energy custommers at every stage of their projects, from design to operation and maintenance.
As a pioneer in the corporate market, Voltalia offers a comprehensive range of services to businesses, from the supply of green electricity and energy efficiency services to the local production of its own electricity.
With more than 1,550 employees in 20 countries on 3 continents, Voltalia has the capacity to act globally for its customers.
Voltalia is listed on the regulated market of Euronext Paris, (FR0011995588 – VLTSA), and is part of the SBF 120, Enternext Tech 40 and CAC Mid & Small indices. The Group is also included in the Gaïa-Index, the index for socially responsible midcaps.Voltalia
Investor relations : invest@voltalia.com
T. +33 (0)1 81 70 37 00Actifin
Press relations : Jennifer Jullia
jjullia@actifin.fr . T. +33 (0)1 56 88 11 11
1 Estimated "normalised EBITDA" at December 31 2023, calculated with an average annual EUR/BRL exchange rate of 6.3 and a wind, solar and hydraulic resource corresponding to the long-term average.
2 Estimated "normalised EBITDA" at December 31 2027, calculated with an average annual EUR/BRL exchange rate of 5.5 and a wind, solar and hydraulic resource corresponding to the long-term average.
3 The above amounts are the sum of the consolidated data, rounded to the first decimal place..
4 Calculated on the basis of an average EUR/BRL exchange rate of 5.48 in the first half of 2023 compared with 5.55 in the first half of 2022.
5 Press release of April 19, 2023
6 Press release of July 3, 2023
7 Press release of May 10, 2023
8 Press release of July 11, 2023
9 Press release of June 14, 2023
10 Press release of July 20, 2023
11 Press release of January 4, 2023
12 Estimated "normalised EBITDA" at December 31 2023, calculated with an average annual EUR/BRL exchange rate of 6.3 and a wind, solar and hydraulic resource corresponding to the long-term average.
13 Estimated "normalised EBITDA" at December 31 2027, calculated with an average annual EUR/BRL exchange rate of 5.5 and a wind, solar and hydraulic resource corresponding to the long-term average.
14 4 MW of solar and 12 MW of thermic
15 Including the Toco and Sable blanc storage complexes
16 Including the Hallen storage complex
17 Including the solar production of OiapoqueAttachment